Forest Home board calls a special meeting on a Dockside review deposit and an engineering consultant
FOREST HOME: Forest Home Township’s board has called a special meeting for Thursday, Nov. 12, at 11 a.m. at the Township Hall, 321 N. Bridge St., Bellaire. The notice, posted on the township’s website Nov. 10 at 4:25 p.m., lists two items before public comment: “a resolution to establish an Escrow Deposit for the Dockside PUD application,” and “hiring an engineering firm to consult on the review of the Dockside PUD application.” It cites Sections 1905.B and 1641.D of the township’s zoning ordinance.
Update, Nov. 11: A separate township notice, dated Nov. 6 and posted on the township’s website Nov. 11, sets the Planning Commission’s public hearing on the Dockside plan, under the name Dockside Point, for Wednesday, Dec. 2, at 6 p.m. in the Bellaire High School PAC room, 205 Victory Ln., Bellaire. It describes a request by Nick McMullen, McMullen Properties, for a special land use permit “for the construction of DOCKSIDE POINT with five condominium units,” a planned unit development, on parcels 05-07-530-013-00, -014-00 and -015-00 at 6340 Old Torch Lake Dr. The notice says written comments sent to the zoning administrator on or before Dec. 2 “will be considered by the Planning Commission at the Public Hearing.” The township’s events page also lists the commission’s regular meeting that evening at 7 p.m. at the Township Hall.
Section 1641.D says the board “shall by resolution establish the amount of the application fee and any required applicant escrow deposit” for a planned unit development. Section 1905.B says such deposits cover the reasonable costs of reviewing an application, which “may include staff costs or consultant fees covering planning, engineering, environmental analysis, wetland delineation, legal review,” and that unspent money is refunded within 60 days of final action.
The township’s notice had set the Planning Commission’s public hearing on the Dockside plan for Nov. 4. As of Nov. 18, the township’s website showed no minutes of that meeting. The special-meeting notice does not mention the hearing.
On its Township page (foresthometwp.com/township), under “Update 11-10-2026,” the township’s website lists the notice with a link to the developer’s PUD submission dated Sept. 18. It is the same 44-page filing posted for the Nov. 4 hearing; we compared the two files and they are identical.
The filing’s two site-plan sheets, by the architect Taylor Studios, are marked “Conceptual Design.” They show the building, parking, docks and setbacks, a lift station vault, grease interceptors and holding tanks, and the existing well with a 75-foot clearance. Its survey is a boundary survey certified Dec. 21, 2018. We found no grading or drainage plan in the filing. On stormwater, the narrative says it “will be attenuated as required by Antrim County and EGLE regulations.” On water, it says the existing well’s viability “is currently being studied by Northern Michigan Health Department” and that the team “has identified an alternate source of water,” which it does not name. The ordinance’s list of PUD application materials includes existing and proposed topography at two-foot contour intervals and the location of drainage and storm sewers, “unless waived by the Planning Commission.” The records we have do not say whether any item was waived.
Records
Notice of special meeting, posted Nov. 10 (PDF) · Notice of the Dec. 2 public hearing, dated Nov. 6, posted Nov. 11 (PDF) · Dockside Village PUD submission, Sept. 18 (township’s copy, PDF, 20.5 MB; site plans pp. 35–36, survey p. 10, utility narrative p. 29) · Forest Home Township Zoning Ordinance (Sections 1641.D and 1905.B, PDF) · Our Dockside story · Forest Home Township page
Respond or add to this
Anyone named here, or whose decision is described, may respond or correct the record at corrections@torchlakeobserver.com. This brief also appears in Around the lake, with the other recent briefs and where each board stands. Forest Home Township: what’s before the board.